April 2015 sp3

                                                 HAYES TOWNSHIP 
            CONSTRUCTION PROGRESS UPDATE 
                  APRIL 27, 2015 

Attended by:  Al Groudreau, Brian Rokosz, Joe Claybaugh 
  Jeff Finney, John Scherrer, Terry Acton , Maye Rood 

Purpose of Update:   Construction Progress Update 
a. Gas Service with DTE 
b. Tie-downs and Anchor bolts missing 
c. Keyless entry system 
d. Dishwasher in staff break room 
e. Water softener connection for future 
f. Electrical / septic pumps 
g. Possible driveway changes (widen out at corner of north end) 
h. Integrate security 
i. Painting on Mezzanine 

Subcontractor submittals needed ASAP for: 
a. Stains for Glu-lams, & 2 x 6 T&G Roofing 
b. Vinyl Fence /Dumpster enclosure
c. Glazing 
d. Re-submittals on Metal Wall & Soffit Panels (layout drawings) 

Submittals needed to be returned ASAP are: 
a. Doors and frames,  b. Brick,   c. Cast Stone,   d. Steel ,  e. Expansion joint, 
f. Casework Bullet Resistant Equipment , g. Light fixtures , h. Flooring, I. Drywall, 
 j. Acoustical 

Duct sizes answered 
Location of parking lot catch basin in reference to new wall  - answered 
Painting of Mezzanine answered 
Shaft wall answered 
LVL sized at main entry 

Next Meeting Scheduled for:  May 4th, 2015 @ 10:00 a.m. 
With Special Board Meeting to follow @ 11:00 a.m. 

Nancy Austin/ Hayes Township Clerk 
04-27-2015 